St Fittick's Church, Torry, Aberdeen

Scheduled monument conservation:

St Fittick's Church

Aberdeen · 2026

Our role
Principal contractor and specialist masonry contractor
Client
Energy Transition Zone (ETZ Ltd)
Architect and contract administrator
EALA Impacts
Structural engineer
Narro Associates
Designation
Scheduled monument
Value
Under £0.5m
Programme
Investigation 2025, repairs January to July 2026
Scope
Render removal, masonry repair, bellcote rebuild, soft wallhead capping, lime harl and limewash, memorial resetting

St Fittick's Church, the former parish church of Nigg, was founded in the late twelfth century, enlarged in the eighteenth and abandoned in 1829. Roofless but still standing in its kirkyard above Nigg Bay, it is a scheduled monument of national importance. Working for Energy Transition Zone Ltd, with EALA Impacts as conservation architect and Narro Associates as engineer, we carried out an investigation phase followed by the full conservation of the ruin, completed in July 2026.

Before & after

Drag across the image to compare the building before our work and after completion.

St Fittick's Church after restoration by LTM GroupSt Fittick's Church before restorationBeforeAfter
St Fittick's Church: drone survey and repair progress

The challenge

A three-coat cement render had been applied over the walls, trapping moisture in the rubble core and hiding the condition of the masonry beneath. Dressed sandstone around the openings was decaying, several openings had been blocked up, the bellcote was unstable and the exposed wallheads were washing lime out of the core. As a scheduled monument, every intervention had to be agreed with the design team and recorded, with an archaeologist in attendance for ground works, and the site sits on a busy public coastal path beside an active harbour, exposed to weather straight off the North Sea.

Our solution

Phase 1 opened up four sample areas by hand, sent mortar samples for analysis and trialled the lime repair and harl, so the full repair could be designed from evidence rather than assumption. In Phase 2 the cement render was removed by hand with fine chisels, elevation by elevation, and the blocked openings were carefully opened up. Loose masonry was pinned, packed and stitched, joints were raked out and repointed in lime, and decayed dressings were cut out and replaced with new sandstone indents worked by hand on site to match the tooling around them. The bellcote was taken down stone by stone, recorded and rebuilt true with a lead tray, and the open wallheads were given a lime cap finished with turf, a soft capping that sheds water but lets the core breathe. The walls were then harled in hot-mixed lime and limewashed, with a smoother limewashed finish to the internal faces, and the memorials set into the walls were lifted by gantry, given new foundations and reset.

St Fittick's Church

“I made a visit to the completed church works and thought the church was looking great, alongside providing a few Aberdeen City Council parks maintenance officers a tour of the completed works which they were really impressed by.”

Martin ForbesSenior Project Manager, Energy Transition Zone (ETZ Ltd)

Outcomes

Cement off, lime back on

Hard render removed and the ruin returned to breathable lime harl, pointing and limewash.

Bellcote and wallheads secured

The bellcote rebuilt true and the wallheads protected with a soft turf capping.

Investigated before it was repaired

A funded investigation phase and mortar analysis shaped the repair, agreed step by step with the design team.