Skye's memorial made watertight:
Portree War Memorial
Somerled Square, Skye · 2018
Portree War Memorial stands in Somerled Square at the centre of Skye's main town, a sandstone monument with a central pillar and inscribed granite panels. For The Highland Council, to a specification by Rural Design, we capped the memorial in new lead, repointed it in lime, cleaned the stone and repainted the lettering.


The challenge
Water was the problem. The concrete capping over the monument had no reliable way of shedding rain, the mortar joints had decayed or been replaced with hard cement, and the sandstone was saturated and soiled. The memorial also sits in the middle of a busy public square, so the works had to be fenced, scaffolded and sheeted while the square stayed open, and the floor slabs around it recorded before anything was lifted.
Our solution
We first checked the pillar and stonework were sound, cleared the vegetation and cored an emergency outlet through the concrete cap. A new ventilated timber roof structure was formed over the cap on treated softwood framing and 18mm marine ply, isolated from the stone with dpc, and covered in Code 6 lead laid to falls with gutters to the four outlets, new spouts where the old pipework could not be reused, and the parapet capping laid to fall back and held with concealed lead clips. The joints were picked out by hand to a minimum of 20mm with fine chisels and hacksaw blades, the original mortar analysed in the laboratory, and the memorial repointed in a matching lime mortar finished flush or slightly recessed to the weathered arrises, with hemp caulking driven into the deep joints as a backing. The granite inscription panels were secured and repointed, our conservator repaired the stonework, and once the stone had dried out under its new cap it was DOFF steam cleaned from an approved sample panel. The lettering was then repainted to an approved sample in Keim mineral paint.
Outcomes
Capped in lead
A ventilated Code 6 lead roof now sheds water clear of the masonry instead of into it.
Lime, not cement
Decayed and cementitious pointing cut out by hand and replaced with an analysed lime mortar.
Legible again
The sandstone cleaned, the granite panels secured and the names repainted in mineral paint.
Have a similar building?
Tell us about it and we’ll come back to you with how we’d approach it.
One of 1,000+ projects
More bridges & monuments
- Brig of Balgownie, Old AberdeenCase study →
- Crathes Castle BridgeCase study →
- Edinkillie ViaductCase study →
- Elgin Feature SculptureCase study →
- Elgin's Bridge, HuntlyCase study →
- Fettercairn Monument ArchCase study →
- Firbush Harbour Wall, Loch TayCase study →
- Garvamore BarracksCase study →
- Kildrummy Castle BridgeCase study →
- Mary Slessor MemorialCase study →
- New Elgin DoocotCase study →
- Powis Gate, King’s CollegeCase study →

Next project
Inverness Townhouse
Inverness, Highlands