Harbour wall repairs:
Firbush Harbour
Loch Tay, Perthshire · 2026
Firbush Outdoor Centre sits on the south shore of Loch Tay, where two rubble-stone breakwaters and a low retaining wall form a sheltered harbour for the University of Edinburgh's sailing and outdoor activities. After a breach opened in the east wall, the University appointed us as principal contractor, working with CLWG Architects, to carry out urgent structural repairs and a wider programme of masonry maintenance across the harbour.






The challenge
Much of the work lay at or below the waterline, with voids washed out along the base of the walls and a section of the east wall above the breach at risk of collapse. Repairs had to be made in and beside deep water, using mortars that would set and survive in permanent immersion. The centre, its lodges and the harbour stayed open and busy throughout, on a single-track lochside road, so every stage was planned around public access, water levels and the weather.
Our solution
We propped the unstable section, carefully took down the masonry above the breach and set it aside for reuse, then rebuilt the core with stainless steel reinforcement resin-fixed into the wall and a structural concrete infill before relaying around 4.2 metres of the upper wall in its own salvaged stone. A stainless steel chain and plate restraint now ties the east wall together. Along the waterline, washed-out voids were built up in selected natural stone with pinnings and full back-bedding, and open joints were raked out by hand and repointed in a fast-setting natural cement mortar specified for immersed masonry, then protected under damp hessian while it cured. Cracks in the north wall were stitched with helical bars, the low retaining wall was rebuilt in short sections on new footings with its original stone as facing, and the harbour walkway was relaid in York stone on a lime bed.
“Thank you and your site personnel for the attention you have given the project over the preceding months.”
David WillisCLWG Architects, contract administrator
Outcomes
The breach closed
The east breakwater rebuilt and restrained, with its own stone back in place.
Built to stay in the water
Underwater voids and joints consolidated in a mortar designed for permanent immersion.
A working harbour throughout
Delivered around a live outdoor centre, keeping the harbour and lochside road open to users.
Have a similar building?
Tell us about it and we’ll come back to you with how we’d approach it.
One of 1,000+ projects
More bridges & monuments
- Brig of Balgownie, Old AberdeenCase study →
- Crathes Castle BridgeCase study →
- Edinkillie ViaductCase study →
- Elgin Feature SculptureCase study →
- Elgin's Bridge, HuntlyCase study →
- Fettercairn Monument ArchCase study →
- Garvamore BarracksCase study →
- Kildrummy Castle BridgeCase study →
- Mary Slessor MemorialCase study →
- New Elgin DoocotCase study →
- Portree War MemorialCase study →
- Powis Gate, King’s CollegeCase study →

Next project
Finnich Malise House
Drymen, Stirlingshire