Lowson Manse, Jamieson Street, Forfar

Masonry and roof repairs:

Lowson Manse

Forfar, Angus · 2024

Our role
Survey, masonry repair, slating and leadwork contractor
Value
Under £0.5m
Programme
From October 2024
Scope
Thermographic drone survey, scaffold, vegetation removal, chimney flaunching and crow step repairs, lime repointing, slate and lead investigation

Lowson Manse in Forfar was designed by Marshall Mackenzie and built between 1912 and 1914 for Lowson Memorial Parish Church. It is a two-storey house in red snecked rubble with crow-stepped gables, tall chimney stacks and a semi-octagonal bay, and is listed Category C. After persistent damp left the house hard to live in, we were asked to find where water was getting in, and then to carry out the masonry and roof repairs needed to stop it.

The challenge

Dehumidifiers had been running in the house since December 2023 without curing the problem, so the cause was in the fabric. Access to the high roof was limited, and the chimneys, crow steps and gable heads are exposed to weather on all sides. Inspection showed biological growth in the stonework, sapling roots in the chimney cans, hard cement pointing and open or cracked joints in the coursed rubble, and cement and failing mortar flaunching around the cans and behind the crow steps. Slate and lead details at the abutments also needed to be opened up to see how water was passing through them.

Our solution

We began with a survey on 22 May 2024, inspecting the roof with a thermographic drone and the interior for damp, and reporting the findings with a method statement for the repairs. A working scaffold was then erected to both gables and chimney saddles, designed to span the lean-to roof and protect it. Vegetation was removed from the stonework, including roots growing into the chimney cans and masonry. Cement and defective mortar flaunching around the cans and at the back of the crow steps was cut out by hand with masons' chisels, and the cement pointing was raked out of the rubble until sound lime mortar was reached. The repair specification rebuilds the flaunching in lime mortar with stone pinnings in two coats, and repoints the crow steps and rubble in traditional lime mortar, finished open and textured to carbonate and kept damp for 14 days. Our slater and leadworker opened up the slating, soakers and lead flashings at the chimneys and abutments to confirm what was needed to make the roof watertight.

Outcomes

Source of damp found

A thermal drone survey and close inspection traced moisture to the chimneys, crow steps and joints.

Cement replaced with lime

Hard cement pointing and flaunching removed and replaced with breathable lime mortar.

Roof details checked

Slating, soakers and lead flashings opened up and assessed at the chimneys and abutments.

← All projects

Have a similar building?

Tell us about it and we’ll come back to you with how we’d approach it.

Clackmannan Town Hall, Clackmannan

Next project

Clackmannan Town Hall

Clackmannan